6C - Green Infrastructure

6Cs Growth Point
Green Infrastructure Strategy Consultation Draft
- Autumn 2009


Select here to return to the main Strategy pages >>>

Select here for the Document Download Area >>>

Introduction

The 6Cs Strategic Green Infrastructure Project Board, a partnership of local authorities and environmental organisations, commissioned Chris Blandford Associates (CBA) to develop a Green Infrastructure Strategy for the 6Cs Growth Point in the East Midlands. The Strategy's long term vision is to protect, enhance and extend networks of green spaces and natural elements in and around the three cities of Leicester, Nottingham and Derby, connecting with their surrounding towns and villages as part of the sustainable growth of the 6Cs sub area. The Consultation Draft of the 6Cs GI Strategy and Action Plan is the culmination of input from over 100 partners over the past 12 months.

The Strategic GI Project Board released the consultant's recommendations as a Consultation Draft version of the Strategy with an 8 week window for wider stakeholder review in order to give partners the opportunity to respond to the findings and recommendations presented. Following the consultation final amendments will be made to the 6Cs GI Strategy before the final version is launched in spring 2010.

The consultation period has now closed.

What will happen next? 

The Strategy Steering Group, appointed by the 6Cs Strategic GI Project Board, will review submitted responses and additional data and information during December 2009 and recommend changes to be made to the 6Cs GI Strategy. CBA will be re-commissioned to action the changes before a final version is produced early 2010. The 6Cs Strategic GI Project Board will sign-off and launch the Strategy during spring 2010.


If you would like to be kept informed about the emerging GI Strategy and future events please sign up to receive the 6Cs GI news bulletin >>> 

 

Back to top of page >>>

Document downloads


Please select the links below to download the documents which have been divided into separate parts to reduce download times whilst maintaining quality of maps. Some files are still large, so please be patient when downloading. If you experience problems, please contact us using the contact form.

6CsGI Strategy Consultation Draft Autumn 09 Part 1 (pdf 2.9Mb) >>>

6CsGI Strategy Consultation Draft Autumn 09 Part 2 (pdf 2.6Mb) >>>

6CsGI Strategy Consultation Draft Autumn 09 Part 3 (pdf 2.9Mb) >>>

6CsGI Strategy Consultation Draft Autumn 09 Part 4 (pdf 2.1Mb) >>>

 

6CsGI Strategy Consultation Draft Annex A1 Autumn09 Part 1 (pdf 4.2Mb) >>>

6CsGI Strategy Consultation Draft Annex A1 Autumn09 Part 2 (pdf 2.5Mb) >>>

6CsGI Strategy Consultation Draft Annex A1 Autumn09 Part 3 (pdf 2.2Mb) >>>

6CsGI Strategy Consultation Draft Annex A1 Autumn09 Part 4 (pdf 214Kb) >>>

6CsGI Strategy Consultation Draft Annex A1 Autumn09 Part 5 (pdf 4.6Mb) >>>

6CsGI Strategy Consultation Draft Annex A1 Autumn09 Part 6 (pdf 3.3Mb) >>>

 

6CsGI Strategy Consultation Draft Annex A2 Autumn09 Part 1 (pdf 1.9Mb) >>>

6CsGI Strategy Consultation Draft Annex A2 Autumn09 Part 2 (pdf 774Kb) >>>

6CsGI Strategy Consultation Draft Annex A2 Autumn09 Part 3 (pdf 1.4Mb) >>>

6CsGI Strategy Consultation Draft Annex A2 Autumn09 Part 4 (pdf 1.2Mb) >>>

6CsGI Strategy Consultation Draft Annex A2 Autumn09 Part 5 (pdf 1.6Mb) >>>

 

6CsGI Strategy Consultation Draft Annex A3 Autumn09 Part 1 (pdf 3.5Mb) >>>

6CsGI Strategy Consultation Draft Annex A3 Autumn09 Part 2 (pdf 2.4Mb) >>>

6CsGI Strategy Consultation Draft Annex A3 Autumn09 Part 3 (pdf 2.5Mb) >>>

6CsGI Strategy Consultation Draft Annex A3 Autumn09 Part 4 (pdf 3.2Mb) >>>

6CsGI Strategy Consultation Draft Annex A3 Autumn09 Part 5 (pdf 3.8Mb) >>>

6CsGI Strategy Consultation Draft Annex A3 Autumn09 Part 6 (pdf 2.1Mb) >>>

 

6CsGI Strategy Consultation Draft Annex A4 Autumn09 Part 1 (pdf 4.1Mb) >>>

6CsGI Strategy Consultation Draft Annex A4 Autumn09 Part 2 (pdf 2.3Mb) >>>

6CsGI Strategy Consultation Draft Annex A4 Autumn09 Part 3 (pdf 3.1Mb) >>>

6CsGI Strategy Consultation Draft Annex A4 Autumn09 Part 4 (pdf 3.8Mb) >>>

6CsGI Strategy Consultation Draft Annex A4 Autumn09 Part 5 (pdf 2.9Mb) >>>

 

6CsGI Consultation Response Form Autumn09 (Word doc 234Kb) >>>

Back to top of page >>>

 

Website Design
Content Management System